Your competition is already running this. Are you?
Install, adjust, repair, and rehabilitate manholes with one skid steer and a two-person crew. The circular cut removes the old frame in one piece, so a repair that used to take most of a day takes about an hour. That means more manholes per day and more bids you can win.
A growing number of municipalities name the Mr. Manhole Method in their bid specifications. If your crew doesn’t run the system, you can’t bid on that work. If it does, you’re one of the few contractors who can.
Set new frames at the right grade on new construction, cut cleanly into existing pavement.
02
Maintenance
Raise or lower frames to match the road before the problem turns into a failed repair.
03
Repair
Replace cracked frames and leaking chimneys without breaking out the road by hand.
04
Rehabilitation
Pull the full frame and chimney in one piece and rebuild the structure with a watertight riser assembly.
More jobs
More jobs for the same cutter
The cutter that handles your manholes can also open the road for water valve box replacement, vacuum excavation, and utility spot repairs on water, gas, and storm lines. More work for the same equipment means a faster return on your investment.
The traditional way takes 4 to 6 hours, a bigger crew, an air hammer, and a square cut that tends to crack under traffic. The Mr. Manhole cutter mounts on a skid steer, removes the frame in about 10 minutes, and gets the repair done in about an hour. The finished structure is watertight, level with the road, and built for a 20-year design life.
See it in action
The numbers
Over $1,100 less per repair. Every job, all season.
A smaller crew, a faster job, and no air hammer rental. Over a season of repairs, the savings add up fast.
*Figures are an example. Your savings will vary with crew size, labor rates, and the number of structures.
“
In the field
After watching the online video and talking to a sales rep, I remained skeptical… With my own two eyes, I witnessed a 27” manhole being cut out, removed in one piece (grade rings and all), reset, and finished to grade with the tolerance of a paper business card in less than an hour. First you accomplished it with your 2 employees, but then repeated it with two of our guys and the results, basically identical!”
Rehabilitation is repairing or rebuilding a manhole so it is structurally sound, watertight, and level with the road. It usually means replacing the frame, sealing or rebuilding the chimney, and bringing the structure back to grade.
Without the right equipment, it means hours of saw cutting and jackhammering. The Mr. Manhole cutter makes a circular cut around the frame and lifts it out in one piece.
It depends on the damage, the type of repair, and site access. The circular cut uses up to 20% less replacement material and up to 20% less excavation than a square cut.